Project: Replace Headframe Bin Bottom Sections

Description of Work:

• The client required the upgrading and
   replacement of Headframe Bin
   Bottom sections. An integral
   piece of equipment for the
   continuous operation of the 
   mine, it was critical that the
   fabrication and installation of
   the project was completed
   within the allotted time. There
   were two bin bottoms that
   needed to be replaced, one was
   during the summer shutdown
   of 2009 and the other during
   summer shutdown 2010. Both
   projects were completed as
   planned and on time.