100000Project: Potash Mine

Description of Work:

• Complete design, engineering,
   fabrication, painting and
   installation of all conveyance
   and supporting structural steel

• Detailed 305 tons of structural
   steel and conveyance equipment

• Fabrication and painting of 100
   tons of structural steel and 61.5
   tons on mechanical conveyance
   equipment by EMW

• 100 tons of structural
   steel erected and installed 

•  500tons/hour mechanical
   conveyance equipment
   assembled, installed and
   commissioned 

 

Website by Look Agency
Copyright 2017 EMW