Project: Water Line Upgrade

Description of Work:

• Additional piping was required
  to provide increased fire
  protection to the existing mill
  and parts of the new expansion

• Restricted and confined location
  of the piping made for some
  extremely difficult tie inns to the
  new fire skid

• Three 10" lines running in an
  area only 34" wide to the
  structural steel and overlapping
  each other all brought together
  to the same location

• This project was completed to
  the NFPA codes and standards
  and was successfully completed
  with zero lost time incidents and
  zero deficiencies

• For this project EMW utilized
  tradesmen, pipefitters and
  pressure welders